NORWEGIAN GANNET






- 94 meters long
- 18 meters wide
- Max speed: 18.5 knots
- Plug-in hybrid – 309 kWh battery pack
- Can be plugged into shore power
- Main engine - Wärtsilä 10V31 - In the Guinness Book of Records for the world's most fuel-efficient engine of its kind
- Cabin space for 53 people
- Produces own fresh water - approx. 50 m3 per day
- Own treatment plant on board for process water - 100 m3 per hour
- 10 RSW tanks – 2,000 m3
NORWEGIAN GANNET - FACTORY

- 8 lines for stunning and bluing with bluing capacity of up to 150T per hour.
- 14 Gutting machines with a capacity of approx. 80T per hour
- Load capacity per trip of 1100T HOG.
- Water treatment plant on board that cleans 100M3 per hour.
- Own production of fresh water.
THE HAV LINE TERMINAL AS






- Total building mass approx. 8,100 m2
- Styrofoam factory built adjacent to packaging plant